Overview period - week 25, 2011.

1. Progress of the project.

Upon interior assembling finishing proper operation of all components and mechanisms was tested.

New air condition compressor was installed on the engine.

New insulation mats were fitted underneath the engine bonnet.

Broken pin of the engine bonnet hinge mechanism was restored.

Rear hubs were disassembled to check bearing condition. Bearings were approved for further use.

Central and rear parts of the exhaust system were repaired to achieve correct operation.

  New paint on the external surfaces was polished. Trimming lines on the both sides of the body were restored.

  After the test drive body was cleaned and protective coating was applied finishing final treatment by fine surface polishing. Interior was also cleaned and reconditioned.

As restoration tasks were completed vehicle was forwarded to the owner.