Restoration process
Initial condition
Bodywork repair and painting
Engine, transmission and auxiliaries repair
Chassis, running gears and all underneath systems
Exterior and all outside parts
Interior and all inside systems
Assembling and final tests
Final pictures
Actual report
The technical report details chassis reassembly milestone tasks for the Mercedes Benz 190SL restoration project.Work performed this week focused on completing the undercarriage mechanical sub-assemblies. This week we finished the assembling and installation process of the rear axle assembling. Technicians pre-assembled all small hardware, rubber mounts, and spring seats before mounting the restored rear single-joint swing axle unit onto the chassis. Following subframe fitment, brake lines, cables, trailing arms, coil springs, and the central compensating spring mechanism were torque-spec aligned and integrated beneath the painted floorpan.Additional restoration photographs documenting this assembly phase are located at: https://www.rmw.lv/page/en/mercedes-benz-190sl-w121-1958-assembling-and-final-tests
#190sl #w121 #RMW
#190sl #w121 #RMW
