Restoration
Initial condition
Dismantling
Bodywork
Underneath
Interior
Exterior
Engine compartment
Assembling
Tuning
Test drive
Final
Actual report
The technical Steyr Daimler Puch 230GE restoration at Riga Master Workshop is proceeding with the integration of the primary fluid and filtration systems. This week, we continue assembling the engine compartment, focusing on the mounting of ancillary components to the inner wings and engine block.
As documented in the photographs, our technicians prepared and installed the fuel filter assembly and specialized hydraulic mounting brackets using new vibration-damping isolators. Technical attention was directed toward the routing of coolant and fuel lines, utilizing period-correct clamps and reinforced hoses to ensure system integrity. These foundational mechanical works are essential for finalizing the engine bay plumbing.
Complete assembly photographs are available on the Riga Master Workshop website: https://www.rmw.lv/page/en/puch-230ge-w461-1990-assembling/
#puch #230GE #w461
