Restoration
Initial condition
Dismantling
Bodywork
Underneath
Interior
Exterior
Engine compartment
Assembling
Tuning
Test drive
Final
Actual report
The technical phase of the Steyr Daimler Puch 230GE restoration at Riga Master Workshop is currently focused on the complex electronic and mechanical systems within the powertrain bay. This week, we continue assembling the engine compartment, specifically integrating the high-voltage ignition components and specialized Bosch control units.
As documented in the technical photographs, our technicians refurbished and mounted the ignition coils and suppressors, ensuring period-correct placement on the inner wings. We also finalized the installation of the fuel injection control modules and associated shielded wiring to guarantee interference-free operation. These precise assembly steps are vital for maintaining the original performance and reliability standards of the Puch 230GE.
#puch #230GE #w461
