Transmission repair
Initial condition and work order
Disassembly, defects detection and compiling parts list
Engine and engine auxiliaries repair
Transmission repair
Running gear repair
Braking system repair
Electrical equipment repairs
Bodywork repair
Interior renovation
Trim components repair
Other components repair
Assembling and final tests
Bent shifting tube first was straightened and then cleaned.
Cleaned components were prepared for surface treatment.
We cleaned and checked all rusty clutch components.
Necessary adjustments were done before clutch installation.
Flywheel was attached to the crankshaft.
We assembled and attached shifting mechanism to the gearbox.
Clutch control mechanism was installed into the bell housing.
Prepared gearbox was attached to the engine.
We assembled propeller shaft using new and restored components.