Assembling and final tests
Initial condition and work order
Disassembly, defects detection and compiling parts list
Engine and engine auxiliaries repair
Transmission repair
Running gear repair
Braking system repair
Electrical equipment repairs
Bodywork repair
Interior renovation
Trim components repair
Other components repair
Assembling and final tests
We continued works on the re-routing wiring harness.
We started assembling installing prepared components.
We installed and adjusted front axle.
We placed new insulation pad onto the firewall.
Fuel tank with all ancillaries returned into the boot.
We installed powerplant and connected it to the wiring harness.
We placed removed engine ancillaries and recreated all systems.
We returned in place reconditioned heating and ventilation system radiators and fans.
We returned into position reconditioned cooling system component.
We finished recreation of the rear end of the body installing decoration elements, rear lamps and rear bumper.
We continued assembling installing and adjusting front wings.