Running gear repair
Initial condition and work order
Disassembly, defects detection and compiling parts list
Engine and engine auxiliaries repair
Transmission repair
Running gear repair
Braking system repair
Electrical equipment repairs
Bodywork repair
Interior renovation
Trim components repair
Other components repair
Assembling and final tests
Shock absorbers were operable, so we just renewed paintwork.
We completely disassembled steering gear for repair.
We assembled steering gear preparing it for installation.
Using restored components, we assembled front axle items.
Metal particles on the oil drain plug were calling for closer inspection of the main gear condition.
We completely disassembled rear axle for defects detection and repair.
All steal parts were cleaned and painted.
New seals and gaskets were used assembling rear axle.
Restored rear axle was prepared for installation.
We manufactured new travel limiters of the rear axle.
Restored parts were used for assembling components of the steering gear.
Using restored components we prepared for installation new shock absorbers.
We used new and restored parts preparing steering rods for installation.